The function of removing any changes to CICS protected resources performed by an active CICS unit of work prior to a task or system failure.
                                                            
                                                     
                        
                                                
                        
                        
                            Work the framing contractor does after the mechanical subcontractors (Heating-Plumbing-Electrical) finish their phase of work at the rough (before insulation) stage to get the home ready for a municipal frame inspection. Generally, the framing contractor repairs anything disturbed by others and completes all framing necessary to pass a rough Frame Inspection.
                                                            
                                                     
                        
                                                
                        
                        
                            An operation that reverses all the changes made during the current unit of recovery or unit of work. After the operation is complete, a new unit of recovery or unit of work begins. Contrast with commit.